Posts Tagged ‘The 9 Line’
In Salt Lake City, Utah, the 9 Line Corridor Plan study area is along the old railroad corridor at 900 South. The area of focus is between 200 West and the Surplus Canal. The 9 Line rail trail has been constructed between 700 West and Redwood Road and there are new bicycle lanes between 200 […]
Filed under: Bike, Bikeway, Commuter, Greenway, Paved and Separated, Rail, Recreational, Residential, Retail, Social, Transit Modes, Urban Trails, Use and Character, Walk | 1 Comment
Tags: bicycling, economic development, rail to trail, Salt Lake City, The 9 Line, urban trail, Utah









